OurBigBook Wikipedia Bot Documentation
In electrical engineering, the **load factor** is a measure of the efficiency with which electrical power is being utilized over a specific period of time. It is defined as the ratio of the average load (or demand) over a certain period to the peak load occurring during that period.

Ancestors (6)

  1. Power engineering
  2. Mechanical engineering
  3. Applied and interdisciplinary physics
  4. Subfields of physics
  5. Physics
  6. Home